January 2025 – 4 Denman St, London – CAT A refurbishment, Project complete.

This project combined prepared the ground and basement for a future tenant to put their stamp on the space. Including new incoming electrical feed and water feed.
The 1st , 2nd and 3rd floors are residential flats and were refurbished as existing layout. Replacing like for like locations new kitchenettes and bathrooms / en-suites to create a fresh modern feel.
Existing timber flooring was sanded and re-sealed with a clear coat to bring out the natural features of the existing oak flooring.
Project Team;
Client- Shaftesbury
Project Manager- Colliers
M&E Consultant- MJA associates
Architect- SCH Architects
Comments